Stanberry R-II

Home

P 7131 Design - Build Selection

Where appropriate the District may utilize a design-build method for construction of a specific project. Under this method of construction, a construction entity provides architectural, engineering, labor, material, supplies and equipment related to the construction itself.  If the Board chooses a design-build method, the procedures of Regulation 7131 shall be followed.

View Regulation


Last Updated: August 2016